电气毕业设计外文论文翻译(电气专业的论文设计翻译)

1.电气专业的论文设计翻译

This design based on the actual production, the best operation in substation based system illustrates the basic methods and design of substation by steps, calibration, is to meet the actual production needs a set of optimal design. This design content involves the distribution of introduction, Electricity load calculation and the choice of transformer, The main electrical wiring, short circuit calculation and design of electric equipment of substation and calibration (including breaker, isolating switch, current transformer, busbar voltage transformer, etc), relay protection and substation configuration of the lightning protection, etc. Chapters in writing and large respectively, combined with practical parameters are calculated and drawing part is more intuitive to reflect and form design content.

Keywords: the main transformer, The wiring schemes, Short-circuit current calculation, Electrical equipment,

2.急求电力毕业设计摘要英文翻译

Pick

This paper is combined with electrical system development, aiming at 35 kv substations is running the relative electrical equipment and operation and maintenance experience, according to state and power system for design procedures and systems, according to the relevant requirements, 35kV substation construction according to the actual situation, the regional power substation in 35 kv substations construction design mainly follow safety, advanced technology, the principle of reducing maintenance, actively adopt suited to local conditions of advanced and mature technology and equipment, especially considering substation surrounding areas of power supply reliability and the requirements for long-term planning design, 35 kv substations in design process, mainly for substation automation protection and application of refinement.

Key words: 35 kv transformer substation automation design

3.求电气毕业论文摘要翻译

The graduation design based on the design plan descriptions of the construction of national economy and policy, the policy, technology, combined with the actual engineering prescribed line, ensure reliable power supply, scheduling, meet the technical requirements for flexible.

On the analysis of the original material, on the basis of 110 kv substations electrical design project of the connection mode of operation are analyzed, 110 kv substations is elected meet safe, reliable quality, and the economic operation of the requirements of 110 kv substations wiring way as the normal operation and auto-switch manner. For the main electrical wiring, short-circuit current calculation, to reasonably select the electrical equipment. Finally, according to the first part of the wiring and requirements of the relay protection, substation configuration, in order to ensure the safe and economic operation, prevent accidents or expansion, the safe and economic operation. Integrated substation automation are the second equipment (including substation measuring instruments, signal system, relay protection and remote device and automatic device etc) through the combination of function and the optimization design, the use of advanced computer technology, modern electronic technology, the communication technology and the signal processing technology, the main equipment of the transformer substation, power distribution lines and automatic monitoring and measurement, automatic control and microcomputer protection, and scheduling communication etc comprehensive automation function.

Keywords:

Substation, The main electrical wiring, Transformer, Circuit breaker, Isolating switch, Bus, Short-circuit current, Relay protection, Control and information.

4.求电气毕业论文摘要翻译

The graduation design based on the design plan descriptions of the construction of national economy and policy, the policy, technology, combined with the actual engineering prescribed line, ensure reliable power supply, scheduling, meet the technical requirements for flexible.On the analysis of the original material, on the basis of 110 kv substations electrical design project of the connection mode of operation are analyzed, 110 kv substations is elected meet safe, reliable quality, and the economic operation of the requirements of 110 kv substations wiring way as the normal operation and auto-switch manner. For the main electrical wiring, short-circuit current calculation, to reasonably select the electrical equipment. Finally, according to the first part of the wiring and requirements of the relay protection, substation configuration, in order to ensure the safe and economic operation, prevent accidents or expansion, the safe and economic operation. Integrated substation automation are the second equipment (including substation measuring instruments, signal system, relay protection and remote device and automatic device etc) through the combination of function and the optimization design, the use of advanced computer technology, modern electronic technology, the communication technology and the signal processing technology, the main equipment of the transformer substation, power distribution lines and automatic monitoring and measurement, automatic control and microcomputer protection, and scheduling communication etc comprehensive automation function.Keywords:Substation, The main electrical wiring, Transformer, Circuit breaker, Isolating switch, Bus, Short-circuit current, Relay protection, Control and information.。

5.毕业设计外文翻译

Introduction to Civil Engineering Papers Civil Engineering for the development of a key role, first as a material foundation for the civil engineering construction materials, followed by the subsequent development of the design theory and construction technology. Every time a new quality of building materials, civil engineering will be a leap-style development.People can only rely on the early earth, wood and other natural materials in the construction activities, and later appeared in brick and tile that artificial materials, so that the first human to break the shackles of natural building materials. China in the eleventh century BC in the early Western Zhou Dynasty created the tile. The first brick in the fifth century BC to the third century BC, when the tomb of the Warring States Period. Brick and tile better than the mechanical properties of soil, materials, and easy to manufacture.The brick and tile so that people began to appear widely, to a large number of housing construction and urban flood control project, and so on. This civil engineering technology has been rapid development. Up to 18 to the 19th century, as long as two thousand years, brick and tile has been a major civil engineering construction materials, human civilization has made a great contribution to the even was also widely used in the present.The application of a large number of steel products is the second leap in civil engineering. Seventeen 1970s the use of pig iron, the early nineteenth century, the use of wrought iron bridges and the construction of housing, which is a prelude to the emergence of steel.From the beginning of the mid-nineteenth century, metallurgical industry, smelting and rolling out high tensile and compressive strength, ductility, uniformity of the quality of construction steel and then produce high-strength steel wire, steel cables. As a result of the need to adapt to the development of the steel structure have been flourishing. In addition to the application of the original beam, arch structure, the new truss, a framework, the structure of network, cable structures to promote the gradual emergence of the structure of Yan in the form of flowers.From the brick building long-span structures, stone structures, a few meters of wood, steel structure to the development of tens of meters, a few hundred meters, until modern km above. So in the river, cross the bridge from shelves, on the ground since the construction of skyscrapers and high-rise tower, even in the laying of underground railway, to create an unprecedented miracle.In order to meet the needs of the development of steel works, on the basis of Newton's mechanics, material mechanics, structural mechanics, structural engineering design theory came into being, and so on. Construction machinery, construction technology and construction organization design theory also development, civil engineering from the experience of rising to become science, engineering practice and theoretical basis for both is a different place, which led to more rapid development of civil engineering.During the nineteenth century, 20, made of Portland cement, concrete has come out. Concrete can aggregate materials, easy-to-concrete structures forming, but the tensile strength of concrete is very small, limited use. By the middle of the nineteenth century, the surge in steel production, with the emergence of this new type of reinforced concrete composite construction materials, which bear the tension steel, concrete bear the pressure and play their own advantages. Since the beginning of the 20th century, reinforced concrete is widely used in various fields of civil engineering.From the beginning of the 1930s, there have been pre-stressed concrete. Pre-stressed concrete structure of the crack resistance, rigidity and carrying capacity, much higher than the reinforced concrete structure, which uses an even wider area. Civil Engineering into the reinforced concrete and prestressed concrete dominant historical period. Concrete buildings to bring about the emergence of new economic, aesthetic structure in the form of engineering, civil engineering so that a new construction technology and engineering design of the structure of the theory. This is another leap in the development of civil engineering.A project to build the facilities in general to go through the investigation, design and construction in three stages, require the use of geological prospecting projects, hydro-geological survey, engineering survey, soil mechanics, mechanical engineering, engineering design, building materials, construction equipment, engineering machinery, building the economy , And other disciplines and 。

6.跪求一篇有关地下车库电气设计的毕业论文,有其中的英文翻译最好

1、高压软开关充电电源硬件设计

2、自动售货机控制系统的设计

3、PLC控制电磁阀耐久试验系统设计

4、永磁同步电动机矢量控制系统的仿真研究

5、PLC在热交换控制系统设计中的应用

6、颗粒包装机的PLC控制设计

7、输油泵站机泵控制系统设计

8、基于单片机的万年历硬件设计

9、550KV GIS中隔离开关操作产生的过电压计算

10、时滞网络化控制系统鲁棒控制器设计

11、多路压力变送器采集系统设计

12、直流电机双闭环系统硬件设计

13、漏磁无损检测磁路优化设计

14、光伏逆变电源设计

15、胶布烘干温度控制系统的设计

16、基于MATLAB的数字滤波器设计与仿真

17、电镀生产线中PLC的应用

18、万年历的程序设计

19、变压器设计

20、步进电机运动控制系统的硬件设计

21、比例电磁阀驱动性能比较

22、220kv变电站设计

23、600A测量级电流互感器设计

24、自动售货机控制中PLC的应用

25、足球机器人比赛决策子系统与运动轨迹的研究

26、厂区35kV变电所设计

27、基于给定指标的电机设计

28、电梯控制中PLC的应用

29、常用变压器的结构及性能设计

30、六自由度机械臂控制系统软件开发

31 输油泵站热媒炉PLC控制系统设计

32 步进电机驱动控制系统软件设计

33 足球机器人的视觉系统与色标分析的研究

34 自来水厂PLC工控系统控制站设计

35 永磁直流电动机磁场分析

36 永磁同步电动机磁场分析

37 应用EWB的电子表电路设计与仿真

38 电路与电子技术基础》之模拟电子篇CAI课件的设计

39 逻辑无环流直流可逆调速系统的仿真研究

40 机器人足球比赛图像采集与目标识别的研究

41 自来水厂plc工控系统操作站设计

42 PLC结合变频器在风机节能上的应用

43 交流电动机调速系统接口电路的设计

44 直流电动机可逆调速系统设计

45 西门子S7-300PLC在二氧化碳变压吸附中的应用

46 DMC控制器设计

47 电力电子电路的仿真

48 图像处理技术在足球机器人系统中的应用

49 管道缺陷长度对漏磁场分布影响的研究

50 生化过程优化控制方案设计

51 交流电动机磁场定向控制系统设计

52 开关电磁阀流量控制系统的硬件设计

53 比例电磁阀的驱动电源设计

54 交流电动机SVPWM控制系统设计

55 PLC在恒压供水控制中的应用

56 西门子S7-200系列PLC在搅拌器控制中的应用

57 基于侧抑制增强图像处理方法的研究

58 西门子s7-300系列plc在工业加热炉控制中的应用

59 西门子s7-200系列plc在电梯控制中的应用

60 PLC在恒压供水控制中的应用

61 磁悬浮系统的常规控制方法研究

62 建筑公司施工进度管理系统设计

63 网络销售数据库系统设计

64 生产过程设备信息管理系统的设计与实现

电气毕业设计外文论文翻译

转载请注明出处众文网 » 电气毕业设计外文论文翻译(电气专业的论文设计翻译)

资讯

延期毕业要重写论文吗(论文不过延期毕业一般多久)

阅读(86)

本文主要为您介绍延期毕业要重写论文吗,内容包括毕业论文没过,延迟毕业就是毕业证晚发么还要重写答辩么搜狗,论文不过延期毕业一般多久,因为论文不毕业的或者延期毕业的真的很多吗。题主既然已经遇到这事,不要气馁,也不要感觉不服气,事实已经

资讯

毕业论文建筑专业5000字(跪求5000字建筑毕业论文)

阅读(114)

本文主要为您介绍毕业论文建筑专业5000字,内容包括跪求5000字建筑毕业论文,求有关建筑的论文一篇要求5000字,要规范有摘要,参考文献等,求一篇5000字以上的建筑管理毕业论文范文.要有标题.摘要.正文.参考文。高层建筑细部设计研究 摘要 6-7

资讯

园林工程专业毕业论文范文(园林专业的毕业论文)

阅读(94)

本文主要为您介绍园林工程专业毕业论文范文,内容包括园林专业的毕业论文,求一篇3000字左右,关于“园林绿化”的论文,园林论文2500字左右。生态园林与城市环境保护 论文 摘要: 本文阐述了生态园林的概念、科学内涵、生态园林主要功能及生态学

资讯

蔬菜生产加工工艺毕业论文(关于蔬菜方面的论文)

阅读(92)

本文主要为您介绍蔬菜生产加工工艺毕业论文,内容包括怎么写蔬菜生产论文,关于蔬菜方面的论文,关于蔬菜栽培的论文。无公害蔬菜生产技术要点 2004年我市开展了“食品放心工程”,为了让群众吃上放心菜,我们加大了对无公害蔬菜生产的指导工作。

资讯

中职学前教育毕业论文(中专学前教育毕业论文范文1500)

阅读(103)

本文主要为您介绍中职学前教育毕业论文,内容包括中专学前教育毕业论文范文1500,怎样做一名中专学前教育系的学生论文100字,学前教育毕业论文。1.撰写毕业论文是检验学生在校学习成果的重要措施,也是提高教学质量的重要环节。大学生在毕业前

资讯

电气工程毕业设计论文大概多少字(求电气自动化的论文8000)

阅读(90)

本文主要为您介绍电气工程毕业设计论文大概多少字,内容包括电气工程论文一般多少字数,电气专业论文一般要写多少字大概有几页,大专生,电气自动化毕业论文一般要多少字呢。浅谈发电厂电气自动化系统监控技术发展趋势摘要]文章分析发电厂用电

资讯

本科毕业论文优秀论文比率(毕业论文良好率与优秀率会控制吗)

阅读(87)

本文主要为您介绍本科毕业论文优秀论文比率,内容包括自考毕业论文得优秀的比例大约是多少,毕业论文良好率与优秀率会控制吗,论文的评分标准。会的。为规范本科生毕业设计(论文)的过程与质量管理,树立良好学风,提高本科生毕业设计(论文)质量,很多高

资讯

计算机系毕业论文6000字(计算机系的毕业论文5000—8000字的)

阅读(103)

本文主要为您介绍计算机系毕业论文6000字,内容包括计算机系的毕业论文5000—8000字的,求计算机专业的毕业论文,内容5000到8000字左右的,求一份有关计算机方面知识得毕业论文··急用··40006000字。计算机信息管理毕业论文 浅谈信息管理与

资讯

快毕业了毕业论文没写完咋办(快毕业了,毕业论文难写怎么办)

阅读(91)

本文主要为您介绍快毕业了毕业论文没写完咋办,内容包括快毕业了,毕业论文难写怎么办有技巧吗,毕业论文没按时完成应按何种手续毕业,快毕业了,论文不会写怎么办有谁可以指导一下,关于农业经济管。现在大学里的毕业论文其实已经形同虚设或者

资讯

毕业论文中科学问题的提出(科学问题及其来源)

阅读(100)

本文主要为您介绍毕业论文中科学问题的提出,内容包括科学问题及其来源,论文中问题的提出是指研究背景吗,如何培养科学探究中的提出问题的能力。什么是科学问题区分真科学问题与假科学问题科学问题只能由学生在活动中遇到不解和矛盾时提出来

资讯

毕业论文评语思想道德(高中毕业生思想品德评语怎么写)

阅读(83)

本文主要为您介绍毕业论文评语思想道德,内容包括高中毕业生思想品德评语怎么写,大学生思想品德自我评价范文谁有,大学生思想品德评定班主任意见。你是一个聪明有潜力的学生,但学习不够自觉,管不住自己。面对失败过于坦然,不敢下狠心去拼搏去追

资讯

优秀毕业设计论文查重(论文查重率多少合格呢)

阅读(98)

本文主要为您介绍优秀毕业设计论文查重,内容包括学长的优秀毕业论文可以检测到吗,本科生优秀毕业论文查重率应该多少,听说优秀毕业论文需要二次查重。查重率≤30%者:查重检测通过,学生可以参加系统一组织的毕业论文答辩,是否需要进行修改等具

资讯

土木毕业设计论文评语(如何写土木工程毕业论文评语)

阅读(91)

本文主要为您介绍土木毕业设计论文评语,内容包括如何写土木工程毕业论文评语,如何写土木工程毕业论文评语,急用建筑施工类毕业论文的评语。论文类毕业设计评语】 在整个毕业论文撰写过程中,该生对待毕业论文的态度较为端正,基本能利用学校图

资讯

法律毕业论文外文文献(法律硕士论文如何做外文参考文献)

阅读(68)

本文主要为您介绍法律毕业论文外文文献,内容包括法律硕士论文如何做外文参考文献,法律硕士论文如何做外文参考文献,法学毕业论文外国文献哪里找。施尚达现在很多高校都要求学生在硕士论文写作中能有一定数量的外文参考文献,甚至强制规定要作

资讯

毕业设计答辩论文模板(毕业设计答辩PPT模板)

阅读(63)

本文主要为您介绍毕业设计答辩论文模板,内容包括毕业设计答辩PPT模板,求一份样式比较新颖简洁的毕业论文答辩PPT模版,论文答辩自述怎么写。借花献佛,最近也在准备,希望对你有帮助。毕业论文答辩中PPT制作也是一个很主要的进程,答辩即将到来,你