1.水利水电专业毕业设计前言
呵呵 我毕业设计的时候没写前言 就有个摘要 关键词:水利枢纽;水能设计;多年调节;水库调度;挡水建筑物;泄水建筑物;稳定;应力;水轮机;选型;引水隧洞;厂房;尾水管。
摘 要 乌溪江水电站座落于浙江省乌溪江湖南镇,属于梯级开发电站,根据地形要求,其开发方式为有压引水式。坝区地质条件较好,主要建筑物(砼非溢流坝),泄水建筑物(砼溢流坝),引水建筑物(有压引水遂洞,调压室),地面厂房。
水库设计洪水位234.55m千年一遇),相应的下泄流量5480m3/s;校核洪水位238.16m(万年一遇),相应的下泄流量8435m3/s;正常蓄水位230m. 本设计确定坝址位于山前峦附近,非溢流坝坝顶高程238.35m,防浪墙顶高程239.35m,坝底高程111m,最大坝高127.35m。上游坝坡为折坡,折坡度1:0.2,下游坝坡坡度1:0.8,溢流坝堰顶高程224m。
引水遂洞进口位于坝址上游凹口处,遂洞全长1150m。洞径10.6m. 厂房位于下游荻青位置。
设计水头95.15 m,装机容量4*7.5=30万kw,主厂房净宽22.00m。水轮机安装高程115.36m,发电机层高程127.1m,安装场层高程127.1m(高于下游千年一遇设计洪水位)。
厂房附近布置开关站,主变等。 由此可见,本设计是合理可行的 Abstract The Wuxijiang hydropower station is located in HuNan Town in ZheJiang province ,which belongs to a chain of exploitation . According to the demand of topographic form ,I choose diversion hydropower station . The geology condition is good .The main construction conclude the water retaining structure (the concrete non –over-fall dam) ,the release works (the concrete over –fall dam) ,the diversion structure (pressure seepage tunnel ,the surge-chamber ) ,and the surface power station . The design water level is 234.55 m ,its corresponding flow amount is 5480m3/s .The check level is 238.16 m ,its corresponding flow is 8435m3/s .The regular water retaining level is 230 m . The dam site is near the former saddle .The crest elevation of the non-over-fall dam is 238.35.0 m ,and the base elevation is 111m ,The max height of the dam is 127.35 m ,The upstream dam slope is 1:0.1 ,the downstream dam slop is 1:0.8 ,the spillway crest elevation is 224.0 m .The inducer of the seepage tunnel is located at the recess place ,The length of tunnel is 1150 m ,the diametric of which is 10.6 m . The workshop building is located at downstream ,the design level of the turbine is 95.15 m , the equipped capacitor is 30*104kw ,the clean width is 22 m , its whole length is 73.7m . The fix level of the turbine is 127.1 m , and the height lf dynamo is 127.1 m . Near the workshop building , there are switch station and the main transformer and so on .。
2.水利工程毕业设计论文
请参考下面2篇: 【题名】:水利工程 【摘要】: 水利工程基础学科混流式水轮机转轮动载荷作用下的应力特性;受漩涡作用的水下块石的起动流速;复式河槽流量计算方法比较与分析;二维溃坝洪水波的演进绕流和反射的数值模拟;分部面积超蓄产流法;天然河流被改变条件下的降雨径流预报模型;面向对象方法在河网非恒定流计算中的应用;水工材料土工合成材料加筋土抗剪作用的试验研究;新老混凝土粘结面渗透性能试验研究;水工结构土石坝沉降一填筑灰色监测模型分析;高碾压混凝土拱坝分缝形式及破坏机理研究;碾压混凝土拱坝单向间隔诱导缝等效强度研究。
【题名】:水利工程 【摘要】:水利工程基础学科 突扩突缩式内流消能工的数值模拟研究;湖底地形对风生流场影响的数值研究;动水环境中有限宽窄缝湍射流的水力特性研究;双局部行进波对流的时空结构;水工材料 钢筋混凝土结构锈蚀损伤的解析解;跳回失稳研究;浇筑式沥青混凝土防渗层配合比优选方法研究;堤基渗流管涌发展的理论分析。
3.水利水电专业毕业设计前言
呵呵 我毕业设计的时候没写前言 就有个摘要 关键词:水利枢纽;水能设计;多年调节;水库调度;挡水建筑物;泄水建筑物;稳定;应力;水轮机;选型;引水隧洞;厂房;尾水管。
摘 要 乌溪江水电站座落于浙江省乌溪江湖南镇,属于梯级开发电站,根据地形要求,其开发方式为有压引水式。坝区地质条件较好,主要建筑物(砼非溢流坝),泄水建筑物(砼溢流坝),引水建筑物(有压引水遂洞,调压室),地面厂房。
水库设计洪水位234.55m千年一遇),相应的下泄流量5480m3/s;校核洪水位238.16m(万年一遇),相应的下泄流量8435m3/s;正常蓄水位230m. 本设计确定坝址位于山前峦附近,非溢流坝坝顶高程238.35m,防浪墙顶高程239.35m,坝底高程111m,最大坝高127.35m。上游坝坡为折坡,折坡度1:0.2,下游坝坡坡度1:0.8,溢流坝堰顶高程224m。
引水遂洞进口位于坝址上游凹口处,遂洞全长1150m。洞径10.6m. 厂房位于下游荻青位置。
设计水头95.15 m,装机容量4*7.5=30万kw,主厂房净宽22.00m。水轮机安装高程115.36m,发电机层高程127.1m,安装场层高程127.1m(高于下游千年一遇设计洪水位)。
厂房附近布置开关站,主变等。 由此可见,本设计是合理可行的 Abstract The Wuxijiang hydropower station is located in HuNan Town in ZheJiang province ,which belongs to a chain of exploitation . According to the demand of topographic form ,I choose diversion hydropower station . The geology condition is good .The main construction conclude the water retaining structure (the concrete non –over-fall dam) ,the release works (the concrete over –fall dam) ,the diversion structure (pressure seepage tunnel ,the surge-chamber ) ,and the surface power station . The design water level is 234.55 m ,its corresponding flow amount is 5480m3/s .The check level is 238.16 m ,its corresponding flow is 8435m3/s .The regular water retaining level is 230 m . The dam site is near the former saddle .The crest elevation of the non-over-fall dam is 238.35.0 m ,and the base elevation is 111m ,The max height of the dam is 127.35 m ,The upstream dam slope is 1:0.1 ,the downstream dam slop is 1:0.8 ,the spillway crest elevation is 224.0 m .The inducer of the seepage tunnel is located at the recess place ,The length of tunnel is 1150 m ,the diametric of which is 10.6 m . The workshop building is located at downstream ,the design level of the turbine is 95.15 m , the equipped capacitor is 30*104kw ,the clean width is 22 m , its whole length is 73.7m . The fix level of the turbine is 127.1 m , and the height lf dynamo is 127.1 m . Near the workshop building , there are switch station and the main transformer and so on .。
4.要写一篇关于水利方面的论文
水资源管理就是综合运用行政、法律、经济、技术和教育等手段,对水资源开发利用保护进行调节的各种行为。
在水资源日益短缺的今天,水资源管理的目的是提高水资源利用率和利用效率,使其发挥最大的社会、环境、经济效益。 1 我国农业水资源管理存在的主要问题 1. 1 缺乏有效的管理机制,导致水资源短缺与水资源浪费共存 现行的水资源管理机制,是一种非高效利用水资源的机制,由此造成水资源短缺与水资源浪费共存尴尬局面。
众所周知,我国的农业水资源严重短缺,但与此形成明显对照的是水资源浪费极其惊人。我国主要灌区的渠系利用系数只有0. 4~0. 6 ,即约有一半的水被浪费。
例如,我国北方旱区水资源极其紧张,浪费却相当严重,海河流域渠系利用系数约为0. 45 ,引黄灌区下游输水损失达30 %~50 % ,河西走廊一些渠道,水量损失竟高达60 %~80 %。 1. 2 现行体制和政策难以形成有效的节水机制 现行的水资源管理体制存在的弊端,导致管理单位失去节水的积极性,如灌区没有法律地位,缺乏经营管理自主权。
灌区处于两难境地,具有“事业单位,企业管理”的说法,实际上,作为事业单位,没有人事部门下达的行政编制,财政部门不安排事业经费;同时又要求它实行企业办法管理,它既没有法律地位,又受多种限制,不能像企业那样追求利润。现行的政策不利于节水。
目前的灌区收入主要依靠水费,在固定的价格条件下,水费的多寡取决于供水量的多少。一些灌区为了获得较多的收益,甚至鼓励多用水,有些灌区虽然节约了水,但被无偿地调给其它部门,无利可图,严重地影响了节水积极性,不利于节水机制的形成。
1. 3 过度超采,生态环境恶化 由于对地下水严重超采,导致一系列生态环境问题产生,甚至恶化。如在井罐区出现大面积地下漏斗区,全国出现56 个漏斗区,总面积达8. 2 *104km2 ,漏斗的出现,引起地面沉降或裂缝,甚至导致海水入侵。
例如,全国已发现地面塌陷700 点多处,秦皇岛市已经形成32. 4km2 的海水入侵区;黄河流域由于过量不合理使用,多年来不断断流,已经对相关地区产生重大生态环境影响。 1. 4 水利工程管理单位收不抵支,举步维艰 由于水价太低,全国平均水费为运行成本的50 %左右,导致经营单位亏损严重,生存处于困境,甚至难以维持生存。
1. 5 水资源“农转非”现象严重 “农转非”是指农业水资源通过不同的途径改作它用。我国水资源“农转非”现象更加普遍,而且随着时间的推移趋势更加明显,制约农业的发展。
1949 年我国农业用水量约为1001 *108m3 ,占全国总用水量1031 *108m3的97. 1 % ,到1998 年,该比例下降到74. 65 % ,与此同时,工业和城市生活用水比例由2. 9 %上升到24. 6 %。 2 我国水资源管理未来将出现的趋势 2. 1 由供水管理向需水管理转变 传统的水资源管理可以统称为供水管理,其主要的特征是根据工农业用水需求,建立大中型水利工程来实现水资源供需平衡,它为缓解甚至彻底解决水资源供需矛盾发挥了重要作用,并且在今后相当长的一段时间内,在某些地区仍将发挥重要的作用。
随着水利工程不断兴建,工程难度愈来愈大,成本也不断增加,而且随着径流开发加大,带来了系列的生态环境问题,水资源供需矛盾也不断加剧,完全依靠增加工程解决水资源问题已经成为不可能,运用综合手段缓解水资源供需矛盾成为一种必然。供水管理的最大缺陷是忽略了用水者节水的可能性,它将水资源供需矛盾的解决寄托在水源供给上,其结果是水资源浪费的增加和低效。
必须改变供水管理为需水管理。所谓的水资源需水管理就是综合运用行政的、法律的和经济的手段来规范水资源开发利用中的人类行为,从而实现对有限水资源优化配置和合理利用,它强调把水资源作为一种稀缺的经济资源,对水资源的优化利用应着眼于现存的水资源供给,而不是自发的向新的供水能力投资以满足未来的水的需求。
在今后相当长的一段时间内,农业水资源供给量不可能增加,我们必须依靠现在的4000 *108m3左右水实现农业的可持续发展,需水管理是实现这一目标的关键所在。 2. 2 由单项管理向综合管理转变 水资源管理是一个系统工程,涉及到众多方面,如农业、水利、科技、气象、城建、环保、宣传、计划和行政部门等等。
在以往的水资源管理中,各个部门是“铁路警察,各管一段”,缺乏系统地考虑问题,其最终的结果是有利则争,无利则推,使水资源开发利用短期化,持续发展思想很难贯穿到实际工作中去。未来的水资源管理,是站在可持续发展的高度管理水资源,是将水资源放在社会经济环境等大环境中去开发利用,所以,其管理是综合管理,如地上、地下、降水、污水、中水综合管理等,并且与经济结构、社会发展等有机地结合起来。
对于农业而言,为了实现水资源的综合管理,首先设立综合协调机构,从组织上为部门的联合创造条件,如国务院成立全国节水农业工作领导小组,宏观指导全国节水农业工作开展;其次,制订多部门参与的可行的节水农业规划,节水农业发展必须有一个切实可行的节水农业发展规划,并且将此规划作为有关部门工作重要组成部分。为此,首先。