1.毕业设计英文摘要
The spinal column reconstruction in the interspinal implants in thing X-stop finite element analysis application Abstract along with people age unceasing growth, between awl in plate the nucleus pulposus gradually will start to degenerate withered, causes between the awl plate thickness to reduce, will then create the yellow ligament and the small surface joint is large, will initiate the so-called lumbar vertebra narrow sickness, will cause the body to have the nerve intermittent slope good symptom. Solves this symptom method to divide into the surgery and the non-surgery treats, the non-surgery treats for example the physical property treatment and the pharmacological treatment, the effect is not often good, the surgery treats may divide into the traditional surgery and micro creates the surgery two kinds, the traditional surgery method is in the lumbar vertebra fusion the pexia, although this method excised has created the lumbar vertebra narrow yellow ligament and the small surface joint, but the surgery time was long, the wound was big as well as although the lumbar vertebra fusion and fixed has removed the pathological change stage abnormal movement, but the neighbor stage's abnormal movement increased, between the awl in plate's pressure elevated obviously, the small articular process exceptionally drew back changes with the fixed stage bone quantityThe loss, causes the fixed stage vertical motion stage to draw back changes ASD[1], but new micro creates the surgery is opens a small wound in the back, and implants the interspinal to open, then solution lumbar vertebra narrow sickness question. this article uses the model is lumbar vertebra L3~L4, as well as the interspinal implants thing X-STOP. The analysis method is carries on the finite element grid division to X-STOP, under exerts the restraint and the load in above, calculates the restraining stress, thus judges this interspinal to open whether to have the obvious effect. key word: The lumbar vertebra, the spinous process, between the keel the ligament, the interspinal opens X-STOP, the finite element analysis。
2.毕业论文英文摘要翻译
[abstract] This is Changsha YuanGe residential area design, 【construction's long, wide】,(不知道是你写的不全还是怎么,有点不通,如果你要加数字,就用the length of construction is。the width of construction is。) a total of 12 layer, total building area is。, building height of principal part is。. Design content mainly includes the architectural design and structural design .
The part of architectural design Including the overall layout,the plane and vertical transportation, and the requirements of fire prevention and evacuation. Design mainly include
planar configuration, elevation and profile design and fire protection and evacuation design, etc., follow the principle of "safty,availability,economy,aesthetics" , satisfy people's demand for residential use function and aesthetic.
Design structure using short-leg
shear wall system, to adapt to the new housing concept of people. Combining with hand calculation and PKPM computing , including load calculation (gravity load, wind load),shear walls and floor slabs, the design calculation of beam and reinforcement.
Key words: short-leg shear wall; High-rise residential; The structure design
本人CET-6水平,纯手工翻译,除查询专业单词外,绝没使用软件,耗时20分钟,还望采纳。希望你论文获得成功。
3.毕业论文 英文摘要
Today's rapid development of information technology, the society needs more and more diverse, real estate management information is also more and more important, the management of operation data and property data information becomes more and more important.
How to use the standard of management information system and smooth information query input for modern city, the house property intermediary business, so I found a easy application and design of the property management system records inquires are necessary.
Paper discusses "property management system" the theoretical basis and the design thought, system development process and according to the function of the system to achieve the main discusses database management software development process. Major in software engineering theory as the theoretical basis of system development, client/server model in a relational database as the background, professional development of language as a means of realizing database of database management software development process analysis and theoretical research.
4.求毕业论文英文摘要
The new economic era, known as the corporate image of the human, material and financial resources beyond the "fourth resource", the competition among the enterprises of products from the local competition, price competition, resource competition, competition for talent, technology to the development of competition The integrity of corporate competition, that is, the image of competition. Create good corporate image, not only a modern market economy is an inevitable trend of development, but also enterprises face the increasingly fierce market competition and the success of winning a major magic weapon. For large enterprises, corporate image planning has been relatively mature. While many small and medium enterprises because the road taken the low-cost, how cost-competitive promotion to the quality of competition, and even brand competition, or unable, based on this understanding of SMEs, from corporate image recognition system in the concept of identification system Behavior recognition system, visual recognition systems of the three constituent elements of perspective, the current image of the planning for SMEs on the existence of several major problems, propose solutions to the measures, so that small and medium enterprises based on domestic and international trend of a number of simple Discussion.。
5.求毕业论文的英文摘要
The filling pile department is refers to, in the project scene through the mechanical drill hole, the steel pipe pushes methods and so on earth or manpower excavation forms the pile hole in the foundation soil, and lays aside the pile which in among them the reinforcing cage, the irrigation concretes make, according to becomes the hole method to be different, the filling pile may divide into the settling tube filling pile, the drill hole filling pile and digs the hole filling pile and so on several kinds.Drills a hole the filling pile is according to becomes one kind of pile which the pile method classification defines. The filling pile earliest more than 100 year ago in 1893, because of the industry development as well as the population growth, the high-rise construction increased unceasingly, but because many city's ground conditions were quite bad, could not withstand the pressure which directly transmitted by the high-rise construction, the surface following has the thickness very big soft soil or the medium intensity clay level, the construction high-rise construction like still continued to use the friction pile which at that time used in common, had the very big subsidence inevitably. Therefore engineers used for reference have dug a well the technical invention to dig in the hole to construct the reinforced concrete artificially to become the pile. Therefore afterward 50 years later, namely developed in the early-1940s along with the high efficiency drill hole machines and tools first is published successfully in the US, after World War II, the world was specially the European and American developed country economic resurgence and the development, at this point, changes with each new day along with the science and technology the development, drilled a hole the filling pile in high-level, in the ultrahigh layer building and the heavy construction is widely applied. Certainly, in our country, drilled a hole the filling pile design and the construction level also obtained the considerable development.。
转载请注明出处众文网 » 毕业论文英文摘要中姓名(毕业设计英文摘要)