1.建筑给水排水工程毕业设计摘要外文翻译,求高手
The design mainly include: water supplying system, fire fighting system, drainage system, and hot water system. This graduation design can make us to use professional knowledge in practice more systemly and completely, it cultivate our ability to use related knowledge in engineering practice. Water supply system contain tow ways. The basement and one or two floors on the ground are suplyed by the municipal water pipe network, by downfeed type. Three to twelve layers are suplyed by the pool, the water pump and the tank joint water supplying system, by downfeed distribution. Through comparative analysis,confluenceingdrainage system is selected. Hot water supply system contain hot water distribution network and a return pipe. for the safety and reliability requirements of the building, fire hydrant system and automatic sprinkler system are designed independently.
本人搞建筑设计的;人工翻译。请采纳。语句通顺 绝无语法错误。
2.给水排水专业毕业论文咋写,结合城市官网建设与资源可持续的
给水排水专业写的方向很多,我开始也没法下手,还是同学给的莫'文网,靠谱的说
居住小区与建筑内部热水设计秒流量计算方法
概率方法对居住小区设计秒流量的推求
市政给水管网模拟演示系统开发
西部小城镇环境基础设施经济指标研究
NCAF涡凹型气浮设备的开发及应用研究
秦王川盆地南部地下水数值模拟研究
上海世博园大型地表水源热泵对黄浦江水环境的影响
昆明城中村改造对资源环境承载力和基础设施的影响
水体在南方郊野公园中优化设计研究
曝气生物滤池(BAF)计算机辅助设计
三峡库区山地小城镇生活污水沟渠强化处理的试验
湖北省农村生活污水水量水质调查与分析
个旧锡矿高峰山矿段开采期渗流场数值模拟及涌水量预测
IGCC电站工艺系统设计分析与热力学系统
基于ArcGIS的地下管线三维虚拟仿真研究与实现
三峡库区典型农村生活污染负荷计算及处理方法
生态村水环境承载力系统评价研究
沿海低地城市道路建设中环境工程设施配置研究
基于控规的区域建筑能源需求分析
钢筋混凝土矩形隔震贮液结构液固耦合地震响应
某金融港及市民服务中心项目可行性研究
陕西省农村绿色基础设施评价指标体系的构建
周进周出辐流式沉淀池配水系统水力计算
基于建构绿色基础设施维度的城市河道景观规划研究
寒地既有村镇住宅厨卫设施功能提升技术研究
基于城市水健康循环的哈尔滨江段防控体系构建
住宅配套设施综合效益评价研究
黄土高原沟壑地区山村聚落的空间形态
大型双吸离心泵径向力数值计算
城市地下基础管网特许经营BOT模式研究
城市管网三维模型的设计与实现
基于GIS的校园管网管理系统的设计与实现
新时期村庄建设规划理论和方法研究
陕西省农村基础设施投资效果评价体系
矩形混凝土水池与地基共同作用设计理论和方法
3.高价求高人 做 一篇建筑给排水毕业设计
建筑给水排水设计说明
一、设计资料
(1) 建筑资料
建筑各层平面图、建筑剖面图、厨厕大样图等。
建筑物为六层住宅,采用钢筋混凝土框架结构,层高为3M,
室内外高差为0.3M。
(2) 水源资料
在建筑物南侧有城市给水管道和城市排水管道(分流制),据调查了解当在夏天用水高峰时水压为270kPa。每户厨房内设洗涤盆一个,厕所内设蹲式(或坐式)大便器,洗脸盆、淋浴器(或浴盆)及用水龙头(供洗衣机用)各一个。每户设水表一个,整栋住宅楼设总表一个。
二、设计内容
1. 设计计算书一份,包括下列内容
(1) 分析设计资料,确定建筑内部的给水方式及排水体制。
(2) 考虑厨厕内卫生器具的布置及管道的布置与敷设。
(3) 室内外管道材料、设备的选用及敷设安装方法的确定。
(4) 建筑内部给排水系统的计算。
(5) 其他构筑物及计算仪表的选用、计算。
(6) 室外管道定线布置及计算(定出管径、管坡等数据及检查井底标高,井径,化粪池进出管的管内底标高等)。
2. 绘制下列图纸
(1) 各层给排水平面图(1:100)。
(2) 系统原理图。
(3) 厨厕放大图(1:50)。
(4) 主要文字说明和图例等。
三、设计说明
1、给水工程
根据设计资料,已知室外给水管网常年可保证的工作水压270kPa,建筑物六层住宅估算
水压:120+40*4=280kPa,故室内给水拟采用直接给水方式。
2、排水工程
为减小化粪池容积和便于以后增建水中水工程,市内排水系统拟使生活污水和生活废水分质分流排放,即在每个竖井内分别设置两根排水立管,分别排放生活污水和生活废水
3、管道的平面布置及管材
室外给水排水管道平面布置见首层平面布置图。进户管布置在室外,。采用一户一表。,水表选用LXS湿式水表。水表内装在厨房,但每个单元门口都装备传感器以显示用水量。室内给水、排水立管均靠墙布置。给水水平干管、排水横干管均埋地布置。给水管采用u-pvc给水塑料管。排水管用PVC塑料管。
4 管道的敷设及连接方式
给水管刚入户时明装,通过厅堂、厨房、卫生间时均采用暗装方式。给水管和排水管均采用橡胶圈连接方式。
5 洗涤盆和洗脸盆安装高度为0.8M,淋浴器安装高度为2M,低水箱坐式大便器水龙头安装高度为0.51M,洗衣机用水龙头安装高度为1.5M 。
四 设计计算
1 室内给水系统的计算
(1)给水用水定额及时变化系数
因为住宅内有大便器、洗涤盆和沐浴设备,因此设定每人每日生活用水定额(最高日)为200L,小时变化系数为2.8。预测平均每户住4人,则最高日用水量
[1] [2] 下一页
本文来自: 一流设计吧() 详细出处参考:
4.给排水专业的毕业设计一般有什么,我河北农大
我当年毕业的时候,主要是三个方向的设计:给水,排水,建筑给排水。其中给水和排水是小型城镇的管网+处理厂,建筑给排水是综合建筑的给排水+消防设计。其中给水和排水的人数居多,大约占到总数的80%以上(原本在给排水专业学习中,建水也只是半学期的课程)。毕业设计的文件由说明、计算书和图纸组成,其中重点是说明和计算,毕竟没经历过实际工程,图纸内容和深度的要求没有那么高。这些跟之前做过的课业设计很类似,只是深度会加深一些。都是为了做设计而出的课题,不是实际项目。但也不是绝对,还要看带你毕业设计的老师,他手上如果有实际的项目,也会让毕业生帮忙打打杂。
对于毕业设计,我个人认为没有什么太多可担心的。毕竟4年大学都念完了,没有哪个老师会让你不过,只是分数高低而已。而这个分数对找工作没什么帮助,考研更不看了,出国留学看重的是GPA,跟毕业设计关系不大。
不过,作为一个过来人,我倒是有一点建议:就是看你以后的就业选择毕业设计的方向。选择一个跟你以后就业对路的毕业设计课题,对以后开始工作会有些帮助,起码预习过一遍,再上手不会什么都不懂。
这是我04年毕业时候的经验,现在时代发展快,需要与时俱进,不知道还能不能帮到你。
5.求【给水排水工程】【英文】论文
The multilevel residential housing is given and drains off water several questions designed Summary: This text give and drain off water on multilevel residential housing design supply water the exertion of the tubular product , Way of laying of pipeline, water gauge produce family set up, establishment and air conditioner condensation water of pot-type boiler discharge issue goes on the discussion , And put forward some concrete views. Keyword: Skyscraper, supply water the tubular product , the pipeline is laid, The water gauge, the solar water heater The skyscraper is simple with its auxiliary facility, the fabrication cost is low, the characteristic such as being convenient of estate management, Receive the welcomes of the real estate developer and vast resident of small and medium-sized cities very much. How project planning and design of inhabited region, scientific and technological industry of comfortable house, lead the request according to 2000, Improve the design level of the house, build out a comfortable living space for each household, It is each designers duty. As the heart of the house --The kitchen, bathroom, is that the function is complicated, hygiene, safe and comfortable degree are expected much, It is miscellaneous to build, the space expecting much in technology. So, the designer must consider synthetically with the idea and method of global design that the kitchen, bathroom give installation of the drainage pipeline and equipment, etc. Give and drain off water on skyscraper design supply water exertion, to lay pipeline of tubular product, water gauge produce family set up, establishment and empty of pot-type boiler now Transfer condensation water discharge issue discuss together with colleagues. ( 1), supply water tubular product select problem for use Traditional water supply tubular product adopt zinc-plated steel tube generally, because zinc-plated steel tube exchange the corrosion, Use short-lived , use for and send domestic water can satisfied with water quality sanitary standard shortcoming, Ministry of Construction is popularizing the application of the feed pipe of plastics energetically . A lot of districts and cities have already expressed regulations: Forbid designing and using the zinc-plated steel tube , use widely the feed pipe of plastics. The plastics supply water In charge of compared with metal pipeline, light, it is fine to able to bear the intensity of keeping, Send obstruction little liquid , able to bear chemistry better to corrode performance, it is convenient to install, The steel energy-conservation of the province, merit of having long performance life etc.. Supply water and use plastics pipeline: Hard polyvinyl chloride( PVC-U), high density polyethylene( HDPE), pay and unite polyethylene( PEX) , modify the polypropylene( PP-R, PP-C), gather butane( PB), aluminum mould and compound and in charge of and the steel is molded and compound and is managed etc.. Choice of tubular product economic comparative course of technology, technology should from pressure, temperature, environment for use, install method ,etc. go on and consider, Combine owners at the same time request and the house of grade, carry on and fix after being consider synthetically technology not economic. The above plastics supply water tubular product can supply water tubular product as house life. The economic and functional house conciliating Strand room in the face of the masses of with low- and medium-level incomes resident, can select for use hygiene grades of hard polyvinyl chloride in charge of as feed pipe mainly, In order to reduce the fabrication cost; Medium-to-high grade commodity apartment available aluminum Mould and compound and in charge of or other plastics supply water the tubular product as the feed pipe. House mix hot water temperature that water order exceed 600 C, so above-mentioned tubular product in charge of except hard polyvinyl chloride and aluminum plastics compound and in charge of( PE-AL-PE), Mostly the tubular product can be regarded as the hot water pipeline of the house.。
6.急求建筑给排水质量要求和现场管理的论文
浅析建筑给排水质量通病及其防治 摘要 从施工角度分析建筑给排水工程中管道渗漏、管道穿越楼(地)板处的渗漏、管道沟槽开 挖后槽底泡水、施工过程中管道堵塞、管道支架不牢固、给水立管安装、给水系统消毒、卫生洁具安装 等问题产生的原因,并提出了防治办法。
关键词 建筑给排水 质量通病 防治 建筑给排水工程是建筑工程的重要组成部分,其质量的好坏直接影响着建筑工程质量,如当前建 筑工程中经常存在的地面渗漏、管道易堵等水卫设 备安装通病往往影响到整个工程的交付使用,所以,必须予以重视。笔者对上述质量通病做了些调查,就其产生原因及克服办法谈几点意见,仅供施工人 员参考。
1 管道渗漏问题 建筑给排水中管道漏水是常见的质量通病。原 因众多:一是所用材料不合格,如所选用的PPR及 PVC-U管质量达不到国家标准,管材阀门本体与 阀芯、阀盖之间密封性差等造成内漏和外漏,或以次 充好。
这样就要求把好材料选用关,要审查确定合 格供应商,按质量标准对进场材料严格进行复验,对 管材、阀门应逐一进行试压;二是管道连接操作不 当,如用螺纹连接时,加工的螺纹与配件不配套或螺 纹密封材料失效,或是连接不严密使用时容易发生 渗漏;三是把好连接的操作关,无论是螺纹、焊接还 是法兰承插式、热熔等连接,都应采用正确的操作方 法严格规范施工,达到质量标准。2 管道穿越楼(地)板处的渗漏问题 建筑给排水工程常用的管材主要有钢管、铸铁 管和塑料管。
按照《建筑给水排水及采暖工程施工 质量验收规范》(GB 50242—2002)的规定,铸铁管、塑料管一般采用直接穿越楼(地)板的方式施工,钢 管采用设置钢制套管的方式施工。铸铁、塑料下水管道常用的施工方法有随主体 一起施工和预留孔道以后穿管两种方法。
这两种方 法都存在管道与楼(地)板接触部分的严密性问题,如果施工处理不当而出现空隙,则势必造成漏水。较好的处理方法是:对于管道随主体一起施工的工 程,应在土建再做防水找平层之前涂抹防水涂料2 遍,然后土建做防水找平层及防水层;对于预留孔洞 的施工方式,应在管道固定时于管道周围25 mm范 围内用1∶2水泥砂浆灌严(砂浆应掺UEA微胀 剂),砂浆应灌注成八字形,土建所做面层应在管道 周围成20 mm高的台形(见图1);使用塑料管道穿 楼(地)板时,除注意上述问题外,还应注意将嵌在楼 板内的塑料管壁打毛,以利于管道外壁与混凝土的 粘结,减少裂缝产生的可能性。
给水工程和热水工程常采用穿套管过楼(地)板 的方法,为了方便施工,套管埋设一般采用预留孔洞 的方式,具体做法可参考排水立管预留孔洞穿楼(地)板的方法。套管穿楼板时除注意与楼板接触严 密外,还应注意:套管一定采用钢管,不得以镀锌皮 管代替,且套管直径应比所穿管道大两号,套管长度 应比楼板厚多20 mm,以保证安装时上端高出楼板20 mm,下端与楼板齐平。
另外,套管与管道之间的 缝隙应采用聚氨酯、沥青玛蹄脂等材料封严。3 管道沟槽开挖后槽底泡水问题 施工过程中由于各种原因,如:天然降水或其他 客水流进沟槽;对地下水或浅层滞水,未采取排降水 措施或排降水措施不力。
这样会造成槽基被浸泡 后,地基土质变软,会大大降低其承载力,引起管渠 基础下沉,造成管渠结构折裂损坏,对此施工中应采 取预防对策:①雨季施工,要将沟槽四周叠筑闭合的 土埂,必要时要在埂外开挖排水沟,防止客水流入槽 内。②下水道接通河道或接入旧雨水管渠的沟段,开槽应在枯水期先行施工,以防下游水倒灌入沟槽。
③在地下水位以下或有浅层滞水地段挖槽,应使排 水沟、集水井或各种井点排降水设备经常保持完好 状态,保证正常运行。④沟槽见底后应随即进行下 一道工序,否则,槽底以上可暂留20 cm土层不予挖 出,作为保护层。
如槽底已泡水时,应从两个方面采 取对策:①沟槽已被泡水,应立即检查排降水设备,疏通排水沟,将水引走、排净。②已经被水浸泡而受 扰动的地基土,可根据具体情况处置。
当土层扰动 在10 cm以内时,要将扰动土挖出,换填级配砂砾或 砾石夯实;当土层扰动深度达到30 cm但下部坚硬 时,要将扰动土挖出,换填大卵石或块石,并用砾石 填充空隙,将表面找平夯实。4 施工过程中管道堵塞问题 施工过程中,由于管道开口处封堵不当,极容易 造成水泥砂浆和其他建筑垃圾进入管道,很难清理,以致使用后经常出现排水管道堵塞。
对此,施工中 应从两个方面采取对策:一是封口的质量一定要保 证,如采用木塞或用薄钢板制成堵头,钢板上用石灰 砂浆而不用水泥砂浆封堵(水泥砂浆易破碎,进入排 水管后不易清除);二是在施工过程中不盖立管最下 部的排水检查口,在管内设置导物槽(见图2),这 样,立管内的杂物即可经导物槽排出,而不致进入底 部的排水横管。导物槽宜采用厚度大于3 mm的钢 板制作。
5 管道支架不牢固问题 目前工程中给水系统大多采用PPR管,由于其 刚性差,加之施工时不注意支架的安装,会造成管道 弯曲、变形,甚至出现渗漏现象。支架间距严格按照 规范规定设置;支架安装严格按照施工工艺要求进 行施工。
而目前工程中排。
7.急求一个给排水专业职称的论文
建筑给排水工程施工质量控制研究 【摘要】在建设工程中,给排水安装质量好坏影响工程质量。
因此,应做好施工管理与质量控制工作,认真分析质量问题发生原因并采取有效解决方法非常重要。 【关键词】建筑工程;给水排水工程;施工要点;施工管理;质量管理 建筑给排水工程是建筑工程有机组成部分,在人们的日常生活中起着十分重要的作用。
施工单位必须做好施工队伍的素质管理工作,做好参与设计交底和图纸会审等提高施工管理技术,并且做好事前、事中、事后的各环节的质量监督工作才能确保建筑给水排水安装工程的施工质量。本文主要针对建筑给排水工程的施工管理作阐述。
1 施工准备工作 了解图纸、熟悉图纸会审工作,参看土建结构图、装修建筑图、有关设备专业图,核对各种管道的坐标标高是否有交叉,管道排列所占空间是否合理,将设计及施工中将出现的问题及时解决。工程师首先应审查给水排水承包(分包)单位的营业执照、企业资质等级证书、专业许可证及岗位证书等;其次,工程师要审查承包(分包)单位的给水排水施工的相关证明,如给水排水工程技术人以及给水排水工长应有当地城市建设委员会颁发的“岗位证书”,安装电工以及电焊工应持有劳动部门颁发的“特种作业人员操作证”。
如不符合规定要求条件,监理单位有权禁止电气类承包(分包)单位进场。在施工过程中,有合格证书的专业技术人员,不应该少于总人数的50%。
土建工程进行基础施工时,应将给排水管道的出入口,按其将穿越基础的位置、标高和尺寸留出孔洞。砌筑砖墙时,暗装的管道要按有关规定留出墙槽,明装的管道要留出过墙的孔洞。
在事前就做好各个环节的把关工作,以确保施工质量。对施工队伍进行培训、筛选。
施工前对各专业施工班组进行培训,提高他们的质量意识和操作水平,使各分项工程质量达标,实现预定管理目标。对材料和设备质量的把关。
把好给水排水安装工程的材料、构配件、设备的使用,必须符合设计要求和产品质量标准。因此,要把住“四关”,即采购关、检测关、运输保险关和使用关。
优选采购人员,提高他们的政治素质和质量鉴定水平。强化全面质量,保证质量控制。
在施工的全过程,要建立符合技术要求的工艺流程、质量标准、操作规程、建立严格的考核制度,不断地进行和提高施工技术和工艺水平,确保工程质量。 2 施工过程管理技术 在施工中,管理人员应在现场对所有给水排水安装项目的进度、质量及投资、进行不间断的全面跟踪,做好协调和检查。
2.1 做好协调工作 在施工过程中,应该协助业主提前与当地水务部门及消防部门等单位协调好有关事务,如施工组织、施工要求、施工时间、施工费用等问题都要经过多次磋商。 2.2 对材料设备的检查 依据相关施工规范和设计文件,进行材料的几何尺寸、强度和密封试验,杜绝使用劣质施工材料,对各类施工材料,按设计要求核对其材质、型号、规格,并进行外观检查。
材料到达施工现场后,应逐项开箱检查。 2.3 施工现场管理 加强施工现场的管理,组织协调各施工单位具体落实施工日期、施工地点、施工人员、质量检验等事项。
对各施工单位施工进度统一协调指导,如期完成各自承担的施工区域内任务,准时完成施工进度计划的要求。 2.4 施工安全管理 施工人员应认真贯彻执行安全生产规程中的各项规定,加强现场安全教育工作,增强职工安全意识。
在施工现场危险区域采取保护措施,并挂明显的标志牌。严格按《施工现场临时用电安全技术规程》和《建筑施工高处作业安全技术规范》执行。
施工期间到施工现场检查指导,杜绝违章作业。监督检查各施工单位安全管理工作能否正常开展,施工前的安全教育及措施是否落实。
统一规划埋设临时施工用水管网,管线埋设在冰冻线以下,在施工用水主管网每100米长度内应设置消火栓1个。 2.5 施工质量控制 针对工程的具体情况,设置质量控制点、停止点且应分清主次,重点控制。
在施工过程中严格执行隐蔽验收制度。高层施工中给排水管道及设备安装相对较复杂,必须按设计和规范要求通过监理工程师隐蔽验收,检验合格后方可进行下一道工序。
施工过程中,监理人员要监控督促承包商坚持实行工序施工活动前的操作技术交底制度,向所有参与者明确施工质量要求,自觉维护工程质量,提高质量水平。密切注意施工准备前各阶段对影响施工质量的变化,以及工艺与操作情况是否始终符合要求等。
地下管网中非金属管道穿越公路管段,做C20混凝土浇筑3600包箍。对已施工完毕的地下井,可在井口四周堆起土围墙,防止施工车辆碾压或撞坏使污水流回井内。
对已施工完毕的非金属地下管线插立警示牌。对已施工完毕的消防器材四周围设置临时护围栏杆和警示牌,以防来往车辆碰撞。
对地下管网中碳钢金属管道进行防腐作业,提高管道防腐质量。 3 质量保证技术措施 3.1 做好技术交底 为保证给水排水安装工程的施工质量,应切实抓好管理工作中的事前控制。
在施工前,承包单位的管理人员以及给水排水技术负责人、给水排水施工组长等人员都必须参加管理交底。监理以书面形式提出严格的给水排水安。
转载请注明出处众文网 » 给排水施工毕业论文(建筑给水排水工程毕业设计摘要外文翻译,求高手)