施工组织设计(Construction organization plan )是用来指导施工项目全过程各项活动的技术、经济和组织的综合性文件,是施工技术与施工项目管理有机结合的产物,它能保证工程开工后施工活动有序、高效、科学合理地进行。
施工组织设计一般包括五项基本内容:
(一)工程概况
工程的基本情况,工程性质和作用,主要说明工程类型、使用功能、建设目的、建成后的地位和作用;
(二)施工部署及施工方案
施工安排及施工前的准备工作,各个分部分项工程的施工方法及工艺;
(三)施工进度计划
编制控制性网络计划。工期采用四级网络计划控制,一级为总进度,二级为三个月滚动计划,三级为月进度计划,四级为周进度计划。
(四)施工平面图
根据场区情况设计绘制施工平面平置图,大体包括各类起重机械的数量,位置及其开行路线;搅拌站、材料堆放仓库和加工场的位置,运输道路的位置,行政、办公、文化活动等设施的位置,水电管网的位置等内容。
(五)主要技术经济指标
施工组织设计的主要技术经济指标包括:施工工期、施工质量、施工成本、施工安全、施工环境和施工效率,以及其他技术经济指标。
2.施工组织设计摘要的翻译
The construction organization plan is constructs the construction organization's core and the soul, is conceives to the engineering construction project entire process idea with the concrete arrangement, uses for to instruct construction item entire process each activity the technology, the economical and organization's comprehensive document. the this construction organization plan is aims at Xuzhou Hua Peng Jiayuan the 28# building project construction the Platform. When establishment to the project management organization establishment, the construction overall deployed that the construction preparation, the main branch sub-item project job practice, the project quality safeguard measure, the security and the civilized construction measure, the job location management measure and so on many factors considered fully as far as possible, prominent scientific nature, serviceability and pointed, is guaranteed that high quality, the low consumption, the security, civilized, complete completely the construction work important economical technical paper high speed. this design mainly includes the following content: The project construction organization designs, the Chinese and English translation, the construction floor-plan. In order to guarantee that the time, the quality and the security, the civilized work site, save conditions and so on cost, establishes the pointed construction organization plan, each branch sub-item project's characteristic, the structural feature, the construction difficulty degree time and the quality requirement, establish the practical and feasible plan of construction. Instructs the construction smoothly cost engineering project the construction, the control engineering cost, the foundation high quality project. key word: Project, construction.。
3.谁能帮帮忙翻译一下这段施工组织设计摘要..
Construction design is the heart and soul of the construction organization, is the whole process of construction projects and specific arrangements envisaged in the concept to guide the activities of the whole process of construction projects the technical, economic and organizational comprehensive document. As a graduate design graduates, the project is located in Chengdu, for residential buildings, the main wall to wall structure, the main building for the raft foundation; the underground floor, the floor structure divided into 4 units of 11 layers, the bottom 3.0m, standard floor 3.0m, total building height of 33 meters, total construction area of 13600m2, the strength of concrete between C25 to C35. Basic earthquake intensity is 7 degrees two groups, the fire resistance rating level, the design life of 50 years. The time of preparation of the construction design of the project management structure, construction overall plan, construction preparation, the main sub-segment of the construction methods, quality assurance measures, safety and civilized construction measures, construction site management practices and other factors into account as fully as possible, The science, applicability, and relevance, is to ensure high quality, low cost, safe, civilized, high-speed construction tasks to complete all the important economic and technical documents. The design of the preparation of the targeted construction design, each sub-part of the project features, structural features, ease of construction schedule and quality requirements, the preparation of a viable construction plan. To guide the construction of the successful completion of the construction of the project, controlling project costs, create high-quality project.。
4.帮翻译一下土木工程毕业论文摘要,英语高手请进
The design of the subject 12 for the University of the South Campus student apartment building # construction organization design, the apartment building is located in Xi'an Yangling District, six-storey brick-concrete structure, construction area of about 5000m2, the architectural design of the total high-21.45m, high levels of 3.3 per m, seismic intensity of 7 degrees, the structure of life for 50 years. Its main work is divided into four parts: the project in terms of the design construction, construction site, floor plan design, preparation of construction schedule. Calculated in accordance with engineering drawings, construction pipeline construction program options, taking into account engineering and construction programs, the combination of the overall construction period and part of each project with the number and the number of days the progress of plans to draw Bar chart integrated Factors to consider the venue, transport factors, manpower and equipment with the case of a more reasonable choice of programs to map out the construction site layout plan. Keywords: construction organization design; construction schedule; construction site layout plan; pipeline construction Add:。
5.毕业设计英文摘要
The spinal column reconstruction in the interspinal implants in thing X-stop finite element analysis application Abstract along with people age unceasing growth, between awl in plate the nucleus pulposus gradually will start to degenerate withered, causes between the awl plate thickness to reduce, will then create the yellow ligament and the small surface joint is large, will initiate the so-called lumbar vertebra narrow sickness, will cause the body to have the nerve intermittent slope good symptom. Solves this symptom method to divide into the surgery and the non-surgery treats, the non-surgery treats for example the physical property treatment and the pharmacological treatment, the effect is not often good, the surgery treats may divide into the traditional surgery and micro creates the surgery two kinds, the traditional surgery method is in the lumbar vertebra fusion the pexia, although this method excised has created the lumbar vertebra narrow yellow ligament and the small surface joint, but the surgery time was long, the wound was big as well as although the lumbar vertebra fusion and fixed has removed the pathological change stage abnormal movement, but the neighbor stage's abnormal movement increased, between the awl in plate's pressure elevated obviously, the small articular process exceptionally drew back changes with the fixed stage bone quantityThe loss, causes the fixed stage vertical motion stage to draw back changes ASD[1], but new micro creates the surgery is opens a small wound in the back, and implants the interspinal to open, then solution lumbar vertebra narrow sickness question. this article uses the model is lumbar vertebra L3~L4, as well as the interspinal implants thing X-STOP. The analysis method is carries on the finite element grid division to X-STOP, under exerts the restraint and the load in above, calculates the restraining stress, thus judges this interspinal to open whether to have the obvious effect. key word: The lumbar vertebra, the spinous process, between the keel the ligament, the interspinal opens X-STOP, the finite element analysis。
6.毕业设计论文英文摘要急‘‘‘‘‘‘‘‘‘‘
"Graphic image technology" network course management system Abstract: "graphic image technology" network system management courses for managers and the contents are of vital importance for students, the course of this network management system for managers to provide adequate information and efficient means for students can also provide a favourable Resources. Has been the use of traditional methods of the management of student courses, such management methods, there are many shortcomings in the traditional management system limited to the application of the records, not only trouble sometimes errors, lost important documents and information, etc. . With the computer network in the world and the wider use of computer management system to solve not only the emergence of a manual errors, but also greatly increase the efficiency of its work, adapted to the modern life of fast and efficient characteristics. Computer Management System is the incredible speed to penetrate into the various work areas and people's daily life, embodies the most prominent is the field of education. Keyword: class network management, management systems, ASP,。
7.土木工程毕业设计摘要翻译
The design of major projects including the calculation of the list of organizational design and construction of two major parts. Calculation of the list of major projects including the construction of earthworks, masonry work, windows and doors project, part of several concrete projects. The list of projects accounted for only calculated on the basis of the design. Construction Organization, including the main design of some of the major construction plan, construction technology, quality assurance measures, civilization construction, construction measures, such as winter rainy season.。
8.毕业设计英文摘要
The spinal column reconstruction in the interspinal implants in thing X-stop finite element analysis application Abstract along with people age unceasing growth, between awl in plate the nucleus pulposus gradually will start to degenerate withered, causes between the awl plate thickness to reduce, will then create the yellow ligament and the small surface joint is large, will initiate the so-called lumbar vertebra narrow sickness, will cause the body to have the nerve intermittent slope good symptom. Solves this symptom method to divide into the surgery and the non-surgery treats, the non-surgery treats for example the physical property treatment and the pharmacological treatment, the effect is not often good, the surgery treats may divide into the traditional surgery and micro creates the surgery two kinds, the traditional surgery method is in the lumbar vertebra fusion the pexia, although this method excised has created the lumbar vertebra narrow yellow ligament and the small surface joint, but the surgery time was long, the wound was big as well as although the lumbar vertebra fusion and fixed has removed the pathological change stage abnormal movement, but the neighbor stage's abnormal movement increased, between the awl in plate's pressure elevated obviously, the small articular process exceptionally drew back changes with the fixed stage bone quantityThe loss, causes the fixed stage vertical motion stage to draw back changes ASD[1], but new micro creates the surgery is opens a small wound in the back, and implants the interspinal to open, then solution lumbar vertebra narrow sickness question. this article uses the model is lumbar vertebra L3~L4, as well as the interspinal implants thing X-STOP. The analysis method is carries on the finite element grid division to X-STOP, under exerts the restraint and the load in above, calculates the restraining stress, thus judges this interspinal to open whether to have the obvious effect. key word: The lumbar vertebra, the spinous process, between the keel the ligament, the interspinal opens X-STOP, the finite element analysis。
9.施工组织设计的摘要怎么写
给你发个范本 你看看吧
郑东新区贾岗拆迁安置小区1#22#号施工组织设计方案
摘要
施工组织设计是建筑施工组织的核心和灵魂,是对工程建设项目全过程的构思设想和具体安排,用来指导施工项目全过程各项活动的技术、经济和组织的综合性文件。
本施工组织设计是针对郑东新区贾岗拆迁安置小区1#22#号楼工程设计方案的纲领性文件。编制时对项目管理机构设置、施工总体部署、施工准备、主要分部分项工程施工方法、工程质量保证措施、安全及文明施工措施、施工现场管理措施等诸多因素尽可能充分考虑,突出科学性、适用性及针对性,是确保优质、低耗、安全、文明、高速完成全部施工任务的重要经济技术文件。
本设计主要包括以下内容:工程施工组织设计书、施工平面布置图。为确保工期、质量及安全、文明工地,节约成本等条件,编制出针对性的施工组织设计,每个分部分项工程的特点、结构特征、施工难易程度工期和质量要求,编制出切实可行的施工方案。以指导施工顺利地完成本工程项目的建设,控制工程成本,创建优质工程。
关键词:工程概况,平面布置及管理,施工进度计划,施工方案
转载请注明出处众文网 » 施工组织设计毕业论文中英摘要(毕业论文施工组织设计摘要怎么写)